Livingstone House Sliding Glass Doors minimal windows

Livingstone House

Office Refurbishment using minimal windows® Sliding Glass Doors

The Livingstone House project in Finsbury Square involved an office refurbishment including minimal windows® sliding glass doors. By using these sliding glass doors, the natural light intake into the offices is improved as well as allowing for extra ventilation into the offices.

These doors, in particular, have a bi-parting opening, providing the office workers with easy access to the balcony, allowing them to appreciate the incredible views from outside the office. These floor to ceiling sliding glass doors also allow the workers to enjoy the incredible views of London from their desks.

These sliding glass doors have an aluminium minimal frame of 21mm as well as a flush track, creating the impressive floor to ceiling glass facades. These glass facades are ideal in this office as they provide the workers with a panoramic view of London. These KELLER minimal windows® sliding glass doors also have an integrated drainage system, helping to reduce the risk of flooding to the balcony in wetter weather.

Flush Threshold:

All minimal windows® installations can be designed to have a flush floor finish for inside to outside. This allows these doors to be used on wheelchair accessible openings due to the shallow design of the sliding tracks.

Integrated Draining:

KELLER minimal windows® and the larger triple glazed 4+ minimal windows® are both available with an integrated drainage option. These integrated draining options create a neat appearance and bring effective water drainage from both the frames and the glass.